Three Phase UPS Systems
3.0 INSTALATION
3-4
3.2. Unpacking
Carefully unpack the UPS, and then carefully locate the UPS onto the site which has
selected, with all the points in section 3.1 kept in mind.
The UPS has undergone detailed production and QC testing of all the electrical and
mechanical characteristics prior to shipment from the factory. The UPS should be in
proper condition upon receipt. Once received, the UPS should be first checked
visually to determine if any physical damage has occurred during transportation.
Then check to insure that all the accessories/options (match with your purchase
order) have been included.
- DOOR KEY
- BATTERY FUSE (FOR BATTERY CABINET ONLY)
- SPARE SCREWS FOR COVER PLATE
- SPARE SCREWS FOR CONNECTION TERMINALS etc.
Lastly, check to insure that the specification of the UPS is identical to the
specification of your order. The key items in the specification you must check are:
- RATED POWER OF THE UPS,
- INPUT VOLTAGE & FREQUENCY
- OUTPUT VOLTAGE & FREQUENCY
- NO. OF OUTPUT PHASES ( 3
Φ
)
- BATTERY VOLTAGE OR CELL NO.
Page view 34